Group captive solar · Andhra Pradesh to Bengaluru
Co-own a solar plant. Lock in your power cost for 25 years.
35.5 MW for Bengaluru businesses · Reserving is free and non-binding
Who it's for
Solar peaks at midday, when factories run hardest. The best fit is a Bengaluru HT connection with steady daytime load.
How it works
Buyers own 26% and use at least 51% of the power. The law treats it as their own power, so key surcharges fall away.
{{current.body}}
Why group captive
The usual ways a Bengaluru business can go solar, side by side.
{{c.name}} {{c.sub}} |
|
|---|---|
| {{row.label}} | {{cell.text}} |
A general comparison. The right mix for you depends on your connection and load, and many companies combine rooftop with group captive. We'll show it for your bills.
The route
Every unit the plant makes travels the public grid and is credited to your BESCOM connection. You don't need a wire to the plant.
The site
A 210-acre site at Thippepalli village, O D Cheruvu Mandal, Sri Sathya Sai District, Andhra Pradesh.
Illustrative images.
A day at the plant
It peaks around midday, when factories run hardest. Drag through the day to see it.
Illustrative clear-day profile for a plant this size at this site. The plant isn't built yet. Over a year, with clouds and monsoon, it averages about 1.9 lakh units a day.
Size your share
Enter your average monthly units from your BESCOM bill. We'll show the allocation you'd need and the indicative equity that comes with it.
Find it on your HT bill as units consumed. Use a 12-month average if you can.
Indicative only. Assumes about 1.9 million units a year per MW and a fully allocated plant. Final equity depends on project cost and the buyer group.
Savings depend on your tariff, your load pattern and grid charges for your connection, so we work them out from your bills rather than guess. Send 12 months of BESCOM bills under NDA and we'll reply with a written delivered price and savings estimate within 5 working days.
Reserve and request my estimate →Your investment
The questions every finance team asks first.
Equity is called at financial closure, once land, grid connection and the bank loan are in place. Not before.
Buyers together hold 26%, split by each company's allocation. Roughly ₹34–36 lakh per MW allocated if the plant is fully shared.
Quoted in writing for your connection, with grid, wheeling and banking charges included and a set yearly increase.
A reservation commits you to nothing. You only sign binding agreements after you've seen the final price and terms.
Status
Commercial operation is targeted for 2028, subject to grid connection.
FAQ
{{f.a}}
Reserve an allocation
Allocations are shared among a small group of Bengaluru companies. Reserving takes two minutes and commits you to nothing.
{{formNote}}
Solar 101
The science in plain words, what a solar plant actually makes, and why it can cost less than power from the grid.
The science
From one cell to a power plant
A single cell makes very little. Wire enough of them together and you get a power plant.
Typical figures for today's utility panels. Final equipment is chosen with the builder.
Capacity and units
Megawatts (MW) measure how much power the plant can send at one moment. What you buy is energy, counted in units (kWh) on your bill.
The sun is only at full strength for part of each day, and less in cloudy months. So over a year, each MW of this plant makes about 1.9 million units.
See a day at the plant →Why it costs less
Coal and gas plants buy fuel every day, so their costs follow fuel prices. A solar plant's cost is almost all paid upfront. After that, the sunlight is free for 25 years and more.
Large solar plants are now among the lowest-cost ways to make electricity in India. Karnataka's regulator benchmarks their generation cost at roughly ₹2.65–3.07 a unit.
As co-owners under group captive, buyers don't pay the cross-subsidy and additional surcharges that apply to other power bought over the grid.
Grid tariffs are revised regularly. Your delivered price is fixed for 25 years, with a set yearly increase agreed upfront.
Getting solar power from the plant to your meter adds grid, wheeling and banking charges, so the delivered price sits between these two. That's why we work it out from your own bills. Sources: KERC HT tariff order (Mar 2026); KERC solar generation tariff (2025) and proposal for 2026–29.
Good to know
You draw from BESCOM as usual. Solar units are credited as they're made, and banking rules let some be used later in the month, for a charge.
Output dips in the cloudiest months and peaks in spring. The yearly figure already allows for it.
25 to 30 years. They lose roughly half a percent of output each year, which is built into the plan.
The plant's operator handles cleaning, repairs and monitoring. Nothing changes at your site.
Size your share of the plant, then send your bills for a written price.